Construction of a new skywalk connecting a new parking ramp at the Sheraton Hotel across to the Greysolon Plaza. A cost-saving pre-finished wall panel system was used along with an engineered structural steel bridge frame to streamline the project while maintaining aesthetics.
Project Size
225 LF
Self Performed Services Provided
Site work, concrete, reinforcing, structural steel.