Jensen provided design/build services for the industrial lime processing facility for a national client providing value added minerals to the local market. The facility is made up of four Butler pre-engineered metal buildings with dual pipe bridges conceived by Jensen to connect the facility over a railroad line to the Graymont limestone processing plant.

Project Size

20,000 square feet

Self Performed
Services Provided

Structural design, site work, excavation, pile driving, pile caps, reinforcing, concrete, structural steel, Butler pre-engineered metal buildings, rough carpentry, process equipment setting and alignment.

Project Markets

quotes

JR Jensen was one of the primary contractors for the construction of SMI’s production facility in Superior Wisconsin. When the project’s original design bids came in over budget, JRJ worked extensively with SMI to break down the construction components and suggest not only alternative means & methods, but also alternative designs to reduce the cost of the project. JRJ then proceeded to further assist SMI by developing the details of the design revisions. While it was an arduous process at some points, the team at JRJ always remained energetic, enthusiastic and pleasant to work with. The quality of their work and overall level of cooperation was excellent and I would happily perform another project with them.

Marianne Riola Barbaz, P.E. Manager Project & Engineering Services Paper PCC
Specialty Minerals Inc.